Kessock Bridge
ALPS supplied two suspended platforms to enable inspection and repairs of the runway beams. A team of industrial abseilers assisted with the works.
ALPS supplied two suspended platforms to enable inspection and repairs of the runway beams. A team of industrial abseilers assisted with the works.